Construction Goals Through Fall 2019
Recent Projects Completed
Main floor restroom
Front porch structure and floor
Attic ceiling insulation installed
Glulam beam installed in basement under prayer room
Project Goals for May
Exterior trim repaired
Exterior prepped, primed and painted
Front porch floor patched, sanded and painted
Goals for June
Electrical wiring completed throughout house
Radiant heat water lines installed
Front porch posts and railing installed
Goals for July
Basement readied for cement pour
Radiant heating system completed and tested
Interior casing made, interior posts turned, installed
Goals for August
Basement floor poured
4) Windows installed, main floor east side
Begin drywall main floor